MMA (Methyl Methacrylate) flooring costs £11-15 per m² installed in the UK, with rapid 2-hour cure times justifying the premium. Standard 3mm systems average £11-15 per m²-£11-15 per m²/m², while 5mm heavy-duty applications reach £11-15 per m²-£11-15 per m²/m². The ability to install at -30°C and return to service within 2 hours often saves £10,000+ per day in downtime costs, making MMA economical for critical facilities despite being 50-100% more expensive than epoxy.
When every hour of downtime costs thousands, MMA resin flooring becomes the most economical choice despite its premium price. This ultra-rapid cure technology transforms car park resurfacing, cold storage upgrades, and emergency repairs from week-long shutdowns to same-day completions. After installing MMA systems in time-critical environments across the UK, we'll reveal the true costs and massive savings potential.
MMA System Types and Pricing
MMA System | Thickness | Cost per m² | Cure Time | Application |
---|---|---|---|---|
Primer & Seal | 0.5-1mm | £11-15 per m² | 30 minutes | Light duty seal |
Standard System | 2-3mm | £11-15 per m² | 1 hour | General industrial |
Heavy Duty | 4-5mm | £11-15 per m² | 1.5 hours | High traffic areas |
Mortar Build | 6-8mm | £11-15 per m² | 2 hours | Extreme conditions |
Decorative Quartz | 3-4mm | £11-15 per m² | 1.5 hours | Retail/showrooms |
Anti-Slip Broadcast | 3-4mm | £11-15 per m² | 1.5 hours | Ramps/walkways |
Cure times shown are at 20°C. At 0°C add 30 minutes, at -20°C add 60 minutes. MMA remains workable where epoxy and PU systems fail completely.
The Downtime Savings Equation
MMA's true value emerges when calculating avoided downtime costs:
Facility Type | Daily Downtime Cost | Epoxy (5 days) | MMA (1 day) | Savings |
---|---|---|---|---|
Distribution Centre | £15,000 | £11-15 per m²,000 | £15,000 | £11-15 per m²,000 |
Food processing flooring | £11-15 per m²,000 | £11-15 per m²,000 | £11-15 per m²,000 | £11-15 per m²,000 |
Multi-Storey Car Park | £5,000 | £11-15 per m²,000 | £5,000 | £11-15 per m²,000 |
Cold Storage | £8,000 | £11-15 per m²,000 | £8,000 | £11-15 per m²,000 |
Pharmaceutical | £11-15 per m²,000 | £11-15 per m²,000 | £11-15 per m²,000 | £11-15 per m²,000 |

Cold Weather Installation Premium
MMA's ability to cure at extreme temperatures eliminates seasonal restrictions:
Winter Installation Costs
- Epoxy with heating: +£11-15 per m²/m² for temporary heating
- PU with heating: +£11-15 per m²/m² for moderate heating
- MMA at -20°C: No additional heating costs
- Project delays avoided: Save 2-4 months waiting
For a 1000m² project in January, MMA saves £15,000-£11-15 per m²,000 in heating costs alone, plus avoiding spring price increases of 5-10%.
Calculate Your Downtime Savings
Discover how MMA's rapid installation can save your facility thousands in avoided downtime. Free ROI analysis included.
Get Savings AnalysisMulti-Storey Car Park Specific Pricing
Car parks represent MMA's strongest value proposition:
Application | Area | MMA Cost | Installation Time | Revenue Protected |
---|---|---|---|---|
Deck Coating | Per deck (2500m²) | £11-15 per m²,000-125,000 | Weekend | £15,000 |
Ramp System | Per ramp (200m²) | £10,000-12,000 | Overnight | £2,000 |
Bay Marking | Per bay | £11-15 per m² | 20 minutes | £11-15 per m²/day |
Pedestrian Walkways | Per 100m² | £5,000-6,000 | 4 hours | No closure |
Emergency Repairs | Per 50m² | £3,000-4,000 | 2 hours | Immediate |
Phased installation allows section-by-section completion without full closure, maintaining 80% capacity throughout the project.
MMA vs Alternative System Costs
Factor | MMA | Epoxy | Polyurethane | Polyaspartic |
---|---|---|---|---|
Material Cost/m² | £11-15 per m² | £11-15 per m² | £11-15 per m² | £11-15 per m² |
Labour Cost/m² | £11-15 per m² | £11-15 per m² | £11-15 per m² | £11-15 per m² |
Total Install/m² | £11-15 per m² | £11-15 per m² | £11-15 per m² | £11-15 per m² |
Cure Time | 1-2 hours | 24-72 hours | 12-24 hours | 2-4 hours |
Cold Application | -30°C | +10°C min | +5°C min | -10°C |
Downtime Cost | Minimal | High | Moderate | Low |
For detailed comparisons, see our guides on epoxy versus MMA and polyaspartic alternatives.

Hidden Costs and Considerations
Often Overlooked Expenses
- Odour management: £2,000-5,000 for extraction/ventilation
- Specialist labour: +20% for certified MMA installers
- Material waste: 5-10% due to rapid cure
- Primer requirements: £8-12/m² for special primers
- Weekend rates: +50% for out-of-hours installation
Cost-Saving Opportunities
- Winter discounts: 10-15% November-February
- Multi-area projects: 15-20% volume savings
- Off-peak installation: 25% reduction for flexible timing
- Direct manufacturer supply: Save 10-15% on materials
- Combine with other MMA users: Bulk material discounts
Get Rapid Installation Quote
Need your floor operational tomorrow? Our MMA specialists provide same-day quotes for urgent projects.
Emergency QuoteROI Calculator for MMA Investment
Calculate your return on MMA's premium pricing:
Project Size | MMA Premium | Days Saved | Downtime Value | Net Benefit |
---|---|---|---|---|
500m² warehouse | £10,000 | 4 days | £11-15 per m²,000 | +£11-15 per m²,000 |
1000m² production | £11-15 per m²,000 | 4 days | £11-15 per m²,000 | +£11-15 per m²,000 |
2000m² car park | £11-15 per m²,000 | 5 days | £11-15 per m²,000 | -£15,000 |
300m² cold store | £6,000 | 4 days | £11-15 per m²,000 | +£11-15 per m²,000 |
Formula: Net Benefit = (Downtime Days Saved × Daily Cost) - MMA Premium
Getting Accurate MMA Quotes
Critical Information for Quotes
- Exact downtime windows available
- Temperature range during installation
- Ventilation capabilities for odour
- Access restrictions and phasing needs
- Adjacent area sensitivity to odours
- Required cure time before traffic
- Specific chemical/thermal resistance needs
Red Flags in MMA Quotes
- No mention of odour management plan
- Cure times over 3 hours quoted
- Prices below £11-15 per m²/m² for full systems
- No cold-weather capability mentioned
- Single-component systems (not true MMA)
- No rapid-cure certification provided
Questions for MMA Contractors
- How many MMA projects completed in last year?
- What's your typical crew size and completion rate?
- How do you manage odour in occupied buildings?
- Can you provide 2-hour cure guarantee?
- What happens if cure takes longer than quoted?
- Do you have weekend/night installation teams?
UK Regional MMA Pricing
Region | Standard Rate | Emergency Rate | Weekend Rate |
---|---|---|---|
London/South East | £11-15 per m²-70/m² | £11-15 per m²-100/m² | £11-15 per m²-85/m² |
Midlands | £11-15 per m²-60/m² | £11-15 per m²-85/m² | £11-15 per m²-75/m² |
North England | £11-15 per m²-55/m² | £11-15 per m²-80/m² | £11-15 per m²-70/m² |
Scotland | £11-15 per m²-65/m² | £11-15 per m²-90/m² | £11-15 per m²-80/m² |
Emergency rates apply for same-day service. Weekend rates include Friday night through Sunday completion.
Minimise Your Facility Downtime
Transform weeks of closure into hours. Get expert MMA specification and guaranteed rapid installation for your critical flooring project.
Start Rapid Installation